Skip to content
New roof and solar reset handled as one plan (708) 816-5443
Solar Panel Removal Homewood logo

For roofing companies

Homewood Detach and Reset for Roofing Contractors, Booked by the Panel

Need the deck clear by a certain date? Book the detach per panel and the reset for the day after your crew finishes.

Roofer in a harness crouching to work on dark asphalt shingles

How Do Roofers Book the Solar Portion?

By the panel. Solar Panel Removal Homewood works with roofing contractors across Homewood, Flossmoor, Hazel Crest, Chicago Heights and the nearby south suburbs, and the arrangement is designed to fit a roofing schedule rather than compete with it. Your office supplies the job address, module count and start date. A per-panel rate is confirmed, usually within 48 hours, which you can build directly into your own estimate. Before your crew arrives, we shut down and disconnect the system, remove the panels, racking and conduit, label and inventory each panel and move the equipment to storage. At handover the roof surface is bare, so your installers work without obstruction. When your installation is complete, you let us know and the reset is scheduled. New mounts are installed and flashed into the new roofing at every penetration, the modules are rehung, the wiring restored and output verified by test. Throughout the job we stay in contact with your foreman on timing and on anything noted during removal, so both crews stay aligned.

What Do Roofing Contractors Receive?

A predictable solar subcontractor.

  • Per-panel rates

    A set price per panel, with any additional items identified in advance.

  • Removal before tear-off

    Completed before your crew mobilizes.

  • Reset after installation

    Dated from your completion notice.

  • Clean deck handoff

    All panels, racking and conduit removed from the roof.

  • Flashing into your roofing

    New mounts and flashing at every penetration on the new roof.

  • Crew communication

    Regular contact with your foreman on timing and findings.

  • Claim scopes when needed

    Itemized solar documentation with photos for insurance jobs.

How Does It Fit Your Schedule?

  1. Booking

    Send the address, panel count and tear-off date. The per-panel rate is confirmed by phone, usually within 48 hours.

  2. Detach

    Ahead of your crew, the system is shut down, removed and stored. Your foreman is notified when the deck is clear.

  3. Reset

    After you confirm completion, attachments are flashed into the roofing, the modules rehung and the wiring restored and verified.

What Do Contractors Gain?

  • Straightforward pricing

    Per-panel rates make the solar portion easy to quote.

  • Schedules respected

    Our dates are built from your tear-off and finish.

  • Electrical work handled

    Shutdown and reconnection are done by our crew, not yours.

  • Booked by the panel
  • Clear deck before tear-off
  • Reset after your finish
  • Foreman kept informed

Do You Have a Solar Roof on the Schedule?

Share the details and we will confirm a per-panel rate and a detach date ahead of your crew.